Our Projects

Enviro Hygiene is a one stop shop turnkey solution to all hazardous materials, environmental management and occupational hygiene related issues.

At Enviro Hygiene, our team has successfully completed over 20,000 projects and provided comprehensive services to 100’s of satisfied clients. Our experience and knowledge equips our team to give real time professional advice and solutions which has set us apart on a range of projects from building surveys to complex remediation and disaster recovery. We guarantee practicality, excellence, responsiveness, good communication and integrity on every project

NSW Government

A summary of our NSW Government work

Assessed and supervised environmental remediation of numerous properties impacted by the 2019 / 2020 NSW bush fire event.

Loose-fill asbestos insulation housing inspection, pre-demolition housing hazardous materials surveys, remediation air monitoring and licenced asbestos assessor clearance certification.

Hazardous Materials surveys, friable and non-friable asbestos and lead removal superintending, air monitoring and clearances.

Public housing hazardous materials surveys, friable and non-friable asbestos and lead removal superintending, air monitoring and clearances.

Hazardous materials surveys, friable and non-friable asbestos and lead removal superintending, air monitoring and clearances.

Friable asbestos remediation air monitoring, consult and licenced asbestos assessor clearance certification.

Multidisciplined investigation undertaken in stages due to complexities associated with existing infrastructure and unexpected finds. Site assessments included several soil and groundwater investigations, waste classification, asbestos materials inventory. Multiple sources of contamination were identified, including TCE in groundwater associated with an adjacent (off-site) UST, an on-site diesel UST, impacted fill material, impacted groundwater, and localized hot spots of heavy metal impacts. Remedial works included removal friable asbestos lagging within the boiler room, removal of the boiler unit and associated UST.

Environmental restoration and contaminant management during significant re-developed of large sections for use as nature trails and bicycle paths. The project included an initial assessment of the site for soil contamination and acid sulfate soil. The site was found to be heavily contaminated with asbestos, heavy metals, PAHs, TPH and contain acid sulfate soils. The management plan included supervising site construction work, the construction of landscaped mounds to burry contaminated material and a community education program.

Asbestos in soil management including the management of site construction works where asbestos was identified in soil behind a collapsed retaining wall. Asbestos awareness training was undertaken along with a managed and monitored trial phase for the site drilling works, followed by completion of construction works.

Confined spaces monitoring for the cleaning of fuel and ballast tanks.

Completion of asset register of hazardous materials of various buildings/structures.

Remediation project including environmental impact assessments, asbestos in soil and hazardous materials consultancy

Hazardous materials surveys and re-surveys.

Mould assessment works across 200+ buildings, including surveys, technical works scopes, make safes, semi-quants and post remediation verification via viable and non-viable testing.

School hazardous materials surveys, friable and non-friable asbestos and lead removal superintending, air monitoring and clearances.

Public housing hazardous materials surveys, friable and non-friable asbestos and lead removal superintending, air monitoring and clearances.

Mould remediation and hazardous materials testing and consult.

QLD Government

A summary of our QLD Government work

Commercial

A summary of our commercial work

Preparation of a preliminary ESA, detailed soil/groundwater ESA, preparation of RAP and addressed comments from the NSW accredited site auditor.

Assessed and managed site contamination issues during redevelopment including the management of friable asbestos in soil and UST in-situ abandonment in accordance with the UPSS Regulation 2019 and UPSS Technical Note: Decommissioning, Abandonment and Removal of UPSS.

Undertaken numerous independent site assessments and technical review of field activities and reports by other consultants.

Air monitoring, licenced asbestos assessor clearance certification, consult of asbestos and lead remediation works within both the Sydney CBD and rural NSW.

Hazardous material cleanup advisory, natural disaster events remediation project management, air monitoring and consult.

Assisted with asbestos validation of stockpiled recycled aggregate.

Substation and assets hazardous materials surveys, consult and remediation air monitoring and clearances.

Assets hazardous materials surveys.

Site remediation including friable asbestos removal superintending, air monitoring and clearance inspections.

Environmental assessment and hazardous materials site remediation.

Managed the supervision of site works involving friable asbestos removal associated with the demolition of a former power station.

Assisted with asbestos validation of stockpiled recycled aggregate.